|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Power Supply: | Solar |
| Color Temperature: | >5000K |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

| Borui Product List(All in one solar street light) | |||
| Customization | Support customization and provide ODM&OEM services | ||
| Model | Description | MOQ | |
| Specifications | |||
| BM-KJ | 4head 200w Lamp Size: 1090* 389 * 95mm Solar Panel:Mono-Silicon,6V 70W Battery:3.2V 60Ah,LiFePO4 LED Beads:Sanan 5054, 80 pcs Charge Time: 5-6 hours Light Time:12 hours continuous Luminous Flux: 6000LM Recommended Installation Height: 5-6 Meters Material: Aluminum profile Mode:Radar+Switch+Auto Light Control |
200 | |
| 5head 250w Lamp Size: 1285* 389 * 95mm Solar Panel:Mono-Silicon,6V 90W/340*1175 Battery:3.2V 80Ah,LiFePO4 LED Beads:Sanan 5054, 100 pcs Charge Time: 5-6 hours Light Time:12 hours continuous Luminous Flux: 8000LM Recommended Installation Height: 6-7 Meters Material: Aluminum profile Mode:Radar+Switch+Auto Light Control |
200 | ||
| 6head 300w Lamp Size: 1485* 389 * 95mm Solar Panel:Mono-Silicon,6V 110W/340*1375 Battery:3.2V 100Ah,LiFePO4 LED Beads:Sanan 5054, 120 pcs Charge Time: 5-6 hours Light Time:12 hours continuous Luminous Flux: 10000LM Recommended Installation Height: 6-8 Meters Material: Aluminum profile Mode:Radar+Switch+Auto Light Control |
200 | ||









1.Question : Are you a factory or trading company ?
Answer: We are an SGS recognized OEM / ODM manufacturer factory with export license. We have an outstanding and experienced team made up of "A" player who have a passion for doing something great to create more value for customers world-wide.
2. Question : Why choose cooperate with us ?
Answer : -- Right people, Right product, Right price ;
-- Company-wide customer awareness ;
-- Reliable Quality and All components from world leading suppliers ;
-- Cost-effective export infrastructure and total supply chain management ;
3. Question : How does your factory do regarding quality control ?
Answer : Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control , In Process Quality Control , Outgoing Quality Control , Environment Control, Product Traceability System , Internal Audits & Calibration, Equipment Control & Maintenance , Control of Non-Conforming Materials and etc.
4. Question : What is the average delivery time ?
Answer : Most of the time, it would be around 1 week since after confirm receiving customers' contract money. For mass production purchase order at big quantity, the delivery time could be discussed with each other case by case.