Split Solar Street Light Project Is Dedicated to LED Steel Rod Material

Product Details
Customization: Available
Power Supply: Solar
Color Temperature: 3000K-5000K
Still deciding? Get samples of US$ 260/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
55
Year of Establishment
2006-11-23
  • Split Solar Street Light Project Is Dedicated to LED Steel Rod Material
  • Split Solar Street Light Project Is Dedicated to LED Steel Rod Material
  • Split Solar Street Light Project Is Dedicated to LED Steel Rod Material
  • Split Solar Street Light Project Is Dedicated to LED Steel Rod Material
  • Split Solar Street Light Project Is Dedicated to LED Steel Rod Material
  • Split Solar Street Light Project Is Dedicated to LED Steel Rod Material
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Installation effect
  • Factory workshop details show
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
brda002
Lamp Body Material
Steel
Power
20W
Application
Square, Highway, Garden, Parking Lot, Rural Road Construction
IP Rating
IP65
Certification
CCC, CE, CQC, EMC, GS, PSE, RoHS, SASO
Input Voltage
24v
With Light Source
With Light Source
LED Chips Brand
Borui
Color
6000K (Daylight Alert), Light Grey
Warranty
20years
Lighting Solutions Service
Auto CAD Layout
Input Voltage(V)
12/24
Lamp′s Main Material
Still
Working Time (Hours)
50000
Working Temperature(ºC)
-25-65
Beam Angle(°)
120
Support Dimmer
Yes
Lamp Solutions Service
Project Installation
Light Source
LED
Transport Package
Sea Transport
Specification
Galvanized steel light pole
Trademark
borui
Origin
Yangzhou, China
HS Code
9405409000

Packaging & Delivery

Package Size
1478.00cm * 40.00cm * 70.00cm
Package Gross Weight
100.000kg

Product Description


Split Solar Street Light Project Is Dedicated to LED Steel Rod Material
Product Description

Split Solar Street Light Project Is Dedicated to LED Steel Rod Material

Split Solar Street Light Project Is Dedicated to LED Steel Rod Material

Split Solar Street Light Project Is Dedicated to LED Steel Rod Material
Product Parameters

 

Split Solar Street Light Project Is Dedicated to LED Steel Rod Material
Installation effect


Split Solar Street Light Project Is Dedicated to LED Steel Rod Material

Factory workshop details show

Split Solar Street Light Project Is Dedicated to LED Steel Rod Material

Company Profile

Split Solar Street Light Project Is Dedicated to LED Steel Rod Material

Packaging & Shipping

 


Split Solar Street Light Project Is Dedicated to LED Steel Rod Material

FAQ

1.Question : Are you a factory or trading company ? 
Answer: We are an SGS recognized OEM / ODM manufacturer factory with export license. We have an outstanding and experienced team made up of "A" player who have a passion for doing something great to create more value for customers world-wide.
 

2. Question :  Why choose cooperate with us ?  
Answer :     -- Right people, Right product, Right price ;
                    -- Company-wide customer awareness ;
                    -- Reliable Quality and All components from world leading suppliers ;
                    -- Cost-effective export infrastructure and total supply chain management ;
 

3. Question : How does your factory do regarding quality control ?  
Answer : Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control , In Process Quality Control , Outgoing Quality Control , Environment Control, Product Traceability System , Internal Audits & Calibration, Equipment Control & Maintenance , Control of Non-Conforming Materials and etc.
 

4. Question : What is the average delivery time ?  
Answer : Most of the time, it would be around 1 week since after confirm receiving customers' contract money. For mass production purchase order at big quantity, the delivery time could be discussed with each other case by case. 

Split Solar Street Light Project Is Dedicated to LED Steel Rod Material

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier